eile PUR 022

eile PUR 022
Polyurethane Based Two Component Waterproofing Material
It is a two-component, epoxy-based, solvent-free, polyurethane-based waterproofing material that can bridge cracks.

areas of usage

  • In water tanks
  • In the channels
  • In wet areas where ceramic tiles will be left open underneath or above
  • Pools and terraces

features of product

  • Since it does not contain solvents, it is suitable for use in closed areas.
  • It adheres perfectly to all kinds of surfaces.
  • Due to its suitable consistency, it can be easily applied even on difficult details.
eile PUR 022 uygulama

Oil, wax, grease, water repellents, loose parts that do not adhere and can easily lift off, and dust that will weaken the adhesion forces on the surface should be cleaned and removed with a floor milling machine. New concrete must be at least 28 days old. The surface should be primed before application. The concrete surfaces to be applied must have at least the following standards: Hardness: R28 = 15 Mpa -- Temperature: 5-35°C -- Relative Humidity: <85%

Component A should be mixed within itself with a mechanical mixer, and the hardener (component B) should be added, paying attention to the mixing ratio. Components A and B should be mixed with a mechanical mixer for at least 3 minutes until they become homogeneous and allowed to rest for 3 minutes. Care should be taken to consume the prepared mixture within its pot life.

Karışım Oranı:

Highly absorbent surfaces such as concrete, cement, screed or wood; Primer application can be started after being previously saturated with eile PUR 710. Surfaces that do not contain moisture should be primed with eile PUR 710 or eile EPX 260, and damp surfaces should be primed with EPX 021. The mixture, which is ready for application, is applied with a notched trowel, airless spray or roller, with a pointsToTakeIntoConsideration of at least 1.5 kg/m².

  • The time for applying a new coat on top of the first floor is at least 12 hours (20°C) and at most 24 hours.
  • After more than 24 hours, the surface must be sanded before application.
  • It is very important that the second coat is applied within the new coat application time specified above.
  • In the application made with a notched trowel that spreads completely on the surface, air bubbles should be removed from the fresh coating with a porcupine roller.
  • Full mechanical and chemical resistance is achieved in approximately 7 days.
  • The relative humidity of the air should be maximum 80%, and the application temperature (environment and surface) should be between +10°C and +30°C.

Component A: 20 kg -- Component B: 5 kg

It should be stored in its unopened original packaging, in dry conditions between +5 °C and +30 °C.

Chat on WhatsApp