eile TU 06

areas of usage
- As a primer on the surface of ceiling plasters,
- Indoors, vertical surfaces and ceilings
features of product
- To prevent water absorption of the concrete surface,
- There is no solvent in its composition,
- It has ease of application
- It increases the adherence of cement and gypsum-based plasters to exposed concrete; increases the working time by preventing rapid water loss.

The surface to be applied should be cleaned from residues such as dust, oil, paraffin and loose parts that will reduce adherence. Care should be taken to ensure that the surface to be applied is solid, carrier, dry and dust-free.
4 liters or 6 liters of clean water is added to the 12 kg TU-06 PRIMER bucket and mixed with a low speed mixer for 3-4 minutes until a homogeneous appearance is achieved.
Karışım Oranı: 12 kg TU-06 / 4 lt-6 lt water
The homogeneous mixture is applied to the surface, whose strength and absorbency have been previously checked, with a brush or textured roller. Cement-based or gypsum-based plaster application that can be applied on it can be started after 24 hours. TU-06 must dry completely before starting the plaster application.
- Application should be done between +5 °C - +30 °C. If the environment is outside the required temperature range, suitable conditions should be waited.
- The material should be kept homogeneous by mixing at intervals, care should be taken to prevent it from collapsing.
- The applied surface should be protected from dirt and dust.
- Application should not be done in places with high humidity or on wet surfaces.
- It should not be applied on surfaces that are frozen, melting or in danger of freezing within 24 hours.
12 kg plastic bucket
It should be stored in its unopened original packaging, in a cool and dry environment, at temperatures above + 5 AC - + 35 AC, away from direct sunlight.
