eile PLY 2100

areas of usage
- It is used in all kinds of constructions to glue XPS, EPS and rock wool thermal insulation boards.
features of product
- It adheres perfectly.
- It has a long working period.
- It is easy to prepare and apply.
The application surface should be strong, clean, dust-free, set and leveled. The cracks and holes on the surface must be fixed with eile TH 60 or eile TH 70. Early drying and shedding risk of the adhesive mortar should be eliminated in highly absorbent surfaces. In order to increase the performance of the adhesive mortar, the suitable moisture level or priming should be provided. Necessary precautions for waterproofing should be taken in the parts exposed to water. Horizontal and vertical threads should cover the building or front surface for leveling.
A clean mixing bowl is filled with the necessary amount of water by means of a scale. Then, eile PLY 2100 is slowly added into the bowl. It is mixed with a low speed mixer for 3 - 5 minutes until obtaining a homogenous mixture. The mixture waits for 5-10 minutes and mixed again for 20-30 seconds to get it ready for use.
Karışım Oranı: 5.5-6.5 liters of water for 25 kg of powder, 0.220-0.260 liters of water for 1 kg powder
Point Adhesive Method: It is applied as a strip of 5 mm along the adherence surface edges of thermal insulating boards. Three big pieces are spotted on the midpoint of the boards using a mortar trowel. 40% of the surface area of the jacketing board should be covered with the adhesive. Notched Trowel Method: It is completely spread on the surface or insulation board using a steel notched trowel. It can be preferred when the application surface is smooth. After the application of the adhesive, the insulation boards are placed on the wall surface without leaving spaces.
- For EİLE PLY 2100 application, if the ambient temperature is below +5°C or above +30°C, the suitable conditions should be met. Extremely hot, rainy or windy weather is not suitable for application.
- The material starting to dry should not be mixed with water and new material.
- The glued thermal insulating boards are fixed on the surface using suitable plugs.
- The prepared mixture should be used within 90 minutes.
- The board surfaces glued with eile PLY 2100 are ready to be plastered at least 2 days later.
Kraft sack of 25 kg
Best stored in cool and dry place in their unopened package with a maximum 10-fold stacking.
