Instructions in terms of tie rod and crude metal placement Preparation

At first you make a hole, which is min. 4mm. bigger than the crude metal’s diameter.
The hole you made shall include neither compressed air nor dust. If there remains dust in the hole, it can damage the adherence of the epoxy material.
 

Addition of Chemical Insertion Pieces and the Crude Metal

The Power WT 1, Epox, Rotfix is placed on the cartridge pistol
The first mixture is used aimless until a homogenous mixture is obtained.
 
Nearly 3/2 of the hole is filled with the prepared mixture
 

To Place a Crude Metal with EPX 100

To place a crude metal with EPX 100;
The A and B components are first mixed in themselves separately Then they are mixed together
 
The mixture has to be filled into the holes via a joint filler pistol.
 
 

To Place a Crude Metal with EPX 240

To place a crude metal with EPX 240;
At first A and B components are mixed together. Than the C component Is added to the mixture.
 
The mixture is in a fluid form. As a result the holes can be filled with it.
 
Place the crude metal or the tie rot into the hole by rotating it.
Place also epoxy between the nervure and passes.
 
 

INSTRUCTIONS FOR THE USAGE OF CEMENT BASED REPAIR AND STRENGTHENING MORTARS

Th 70 is used in case of ferroconcrete damages.  
 
 
The damaged rust must be removed from the surface by using breakers.
 
 
Apply Sns 804 to the equipments, from which rust is removed. Than apply Th 70 by using a trowel.          
 
 
Th 70 is used for all kinds of damages on concretes.
Th 70 is durable against sulfate. Therefore it can be safely used by off shore structures.
Tn 60 can be applied on gross concrete.
Grout 50 C is used on machine and steel construction grounds.
If Grout 60 C is used to mount manholes, the road traffic will be usable again after 1, 5 hours.
 

The Usage of Cement Based Water Sealing Products

The unnecessary parts shall be removed from the surface with the help of a breaker.
 
 
 
The rod clearances have to be filled with Th 70.
 
 
 
The surface gaps have to be repaired with one of Th 70, Th 60 or Gbs5000. ( These products are selected by taking the condition of the surface into consideration.)
Th 70 shall be applied and chamfer shall be added to the edges.
 
The surface has to be water logged before the application of cement based materials / product.
 
The B component ( the fluid one) is poured into a clean pot in terms of two component products.
 
The powder component is than poured into the fluid component. They are mixed with a hand drill of low circulation until a homogenous mixture is obtained.
 
Applications with brushes have to be vertical. That means each layer must be in a vertical position in terms of the other layer. 
 
 

Surface Hardeners

The product is spread on The concrete surface, Which begins to gain
Strength.
 
Wait for a time until the product gets a bit wet with water of the concrete.
 
 
 
Begin to press with a polishing machine which includes a disk.
 
Go on with the polishing process, Until the whole surface turns into A plastic surface.
 
than the surface shall begin to het hard and it shall loose its polish. Now you Can go with the process by adding A blade to the machine.   
 
Be careful that all gaps are filled and that all blade traces are Removed from the Surface so that you can Obtain a smooth and Bright surface.
 
       