Instructions in terms of tie rod and crude metal placement Preparation |
At first you make a hole, which is min. 4mm. bigger than the crude metal’s diameter. |
 |
The hole you made shall include neither compressed air nor dust. If there remains dust in the hole, it can damage the adherence of the epoxy material. |
 |
|
| |
Addition of Chemical Insertion Pieces and the Crude Metal |
The Power WT 1, Epox, Rotfix is placed on the cartridge pistol |
 |
The first mixture is used aimless until a homogenous mixture is obtained. |
 |
Nearly 3/2 of the hole is filled with the prepared mixture |
 |
|
| |
To Place a Crude Metal with EPX 100 |
To place a crude metal with EPX 100;
The A and B components are first mixed in themselves separately Then they are mixed together
|
 |
The mixture has to be filled into the holes via a joint filler pistol.
|
 |
|
| |
To Place a Crude Metal with EPX 240 |
To place a crude metal with EPX 240;
At first A and B components are mixed together. Than the C component Is added to the mixture. |
 |
The mixture is in a fluid form. As a result the holes can be filled with it.
|
 |
Place the crude metal or the tie rot into the hole by rotating it.
Place also epoxy between the nervure and passes. |
 |
|
| |
INSTRUCTIONS FOR THE USAGE OF CEMENT BASED REPAIR AND STRENGTHENING MORTARS |
Th 70 is used in case of ferroconcrete damages.
|
 |
The damaged rust must be removed from the surface by using breakers.
|
 |
Apply Sns 804 to the equipments, from which rust is removed. Than apply Th 70 by using a trowel.
|
 |
Th 70 is used for all kinds of damages on concretes. |
 |
Th 70 is durable against sulfate. Therefore it can be safely used by off shore structures. |
 |
Tn 60 can be applied on gross concrete. |
 |
Grout 50 C is used on machine and steel construction grounds. |
 |
If Grout 60 C is used to mount manholes, the road traffic will be usable again after 1, 5 hours. |
 |
|
| |
The Usage of Cement Based Water Sealing Products |
The unnecessary parts shall be removed from the surface with the help of a breaker.
|
 |
The rod clearances have to be filled with Th 70.
|
 |
The surface gaps have to be repaired with one of Th 70, Th 60 or Gbs5000. ( These products are selected by taking the condition of the surface into consideration.) |
 |
Th 70 shall be applied and chamfer shall be added to the edges.
|
 |
The surface has to be water logged before the application of cement based materials / product.
|
 |
The B component ( the fluid one) is poured into a clean pot in terms of two component products.
|
 |
The powder component is than poured into the fluid component. They are mixed with a hand drill of low circulation until a homogenous mixture is obtained.
|
 |
Applications with brushes have to be vertical. That means each layer must be in a vertical position in terms of the other layer.
|
 |
|
| |
Surface Hardeners |
The product is spread on The concrete surface, Which begins to gain
Strength.
|
 |
Wait for a time until the product gets a bit wet with water of the concrete.
|
 |
Begin to press with a polishing machine which includes a disk.
|
 |
Go on with the polishing process, Until the whole surface turns into A plastic surface.
|
 |
than the surface shall begin to het hard and it shall loose its polish. Now you Can go with the process by adding A blade to the machine.
|
 |
Be careful that all gaps are filled and that all blade traces are Removed from the Surface so that you can Obtain a smooth and Bright surface.
|
 |
|